Travel times on Willy Street, Part 2

transportation Madison (WI)

Another look at travel time estimates, now including the JND construction


Author

Affiliation

Harald Kliems ORCID ID for Harald Kliems

 

Published

Nov. 3, 2025

Citation

Kliems, 2025


Disclaimer: This post was put together quickly. Please excuse any typos or self-plagarism from the previous post on this.

Travel time data collection has continued on Willy Street, and now the closure is back on the agenda for the Transportation Commission. Since the last post, construction on John Nolen Drive has begun as well. Traffic Engineering staff anticipated that that construction (which takes John Nolen Drive down to one lane in each direction) would also affect traffic on Willy Street. Let’s take a look at what the data say.

Willy Street travel times

As a reminder, we only analyze data for the most directly affected route: Going from the “Hairball Intersection” of Williamson, Wilson, Blount, and John Nolen to where Williamson splits into Eastwood and Winnebago, and vice versa. This is the section where the rush hour lanes were converted into parking lanes and one would expect the largest impact. Because we don’t have data from before the start of the trial, everything that follows is descriptive and we can’t say that what we’re seeing is or isn’t associated with or caused by the trial.

The first data point for this route was collected on 2025-09-12; the last one was on 2025-11-03, and we have request route data 2194 times.

As before, we exclude any routes that don’t go via Willy Street, such as data pulls that happened during Willy Street Fair, when several blocks of the street were closed to motor vehicles. We will exclude these from the analysis.

Leaflet | Tiles © Esri — Esri, DeLorme, NAVTEQ

Overall travel times

Here are overall summaries for travel times, grouped by direction and whether the data were pulled before or during the JND construction (i.e. before October 14) These number give us a good sense of what typical travel times look like and how much they vary.

Estimated travel times on Willy St (minutes)
jnd_construction Mean Median Minimum Maximum 90% of trips
EB
JND construction 4.2 4.2 3.2 6.4 3.6-4.8
pre-JND construction 4.3 4.3 3.1 7.7 3.5-5.4
WB
JND construction 4.7 4.7 3.3 9.3 3.8-5.5
pre-JND construction 4.7 4.7 3.2 8.4 3.8-5.9

On average, it takes 4.2 minutes to make the eastbound trip and 4.2 minutes for the westbound one. At best, you can make it in 3.2 minutes EB and 3.1 minutes WB. And at worst, the trip takes 6.4 minutes EB and 7.7 minutes WB. The rightmost column shows the range of how long 90% of all trips take. So for the WB direction, 90% of all trips take between 3.5-5.4 minutes; EB you can expect your trips to take between 3.6-4.8 most of the time. Construction on JND makes practically no difference for the mean and median travel time.

When were delays at their worst? Here are 10 longest trips:

10 longest travel times
Travel time (minutes) Time/date Direction JND construction?
9.3 Oct 18 1:25 PM WB JND construction
8.4 Sep 16 8:31 AM WB pre-JND construction
8.3 Oct 8 5:21 PM WB pre-JND construction
7.7 Sep 26 11:16 AM EB pre-JND construction
7.2 Oct 1 5:20 PM WB pre-JND construction
7.1 Sep 18 6:09 PM EB pre-JND construction

Except for one date, the longest travel times occurred before construction began on John Nolen Drive.

A closer look at rush hour data

As before, we look more closely at rush hour data. Again, we group the data by direction and add a grouping for the JND construction:

The graph shows the estimated travel times, separated into eastbound and westbound, whether the estimates are for times when the rush hour lanes would or wouldn’t have been in effect, and for pre- and during JND construction. The thick line in the middle of the box is the median duration; the edges of the box are the 25th and 75th percentile. For the eastbound direction, we see that the median during evening and morning rush hour is similar. The construction on JND appears to have sped up EB traffic in both the pm and am rush hour. Westbound, PM traffic is much slower than AM traffic. In the pm rush hour, the JND construction again seems to have made traffic faster. For both EB and WB traffic, the variability of travel times was largest in the PM rush hour, before JND construction started.

If we want to compare eastbound and westbound times, this chart makes that easier:

In the morning, EB and WB times are similar. Outside of rush hour, WB trips generally take a little longer. And in the afternoon rush hour, WB trips are noticeably slower than EB. Construction on JND seems to mostly make a difference for both EB and WB trips during the PM rush hour.

During the morning rush hour, the rush hour travel lane used to be in effect only for westbound travel. What we see here is that westbound travel, now without the rush travel lane, generally is a little faster than eastbound traffic. But the difference isn’t large, and we also see that there is more variability in westbound than in eastbound travel. Construction on JND doesn’t seem to make much of a difference.

What about the evening?

When we last looked at the data, this was the most interesting finding: Even though the rush hour lanes used to be in effect for EB traffic in the PM rush hour, EB traffic was noticeably faster than WB traffic. This still holds true. When I had shared this finding with city staff, they mentioned that they had made adjustments to signal timing that would explain this. Regarding JND construction: We see less variability in travel times since construction started, and slightly lower travel times compared to pre-construction.

Footnotes

    Reuse

    Text and figures are licensed under Creative Commons Attribution CC BY 4.0. The figures that have been reused from other sources don't fall under this license and can be recognized by a note in their caption: "Figure from ...".

    Citation

    For attribution, please cite this work as

    Kliems (2025, Nov. 3). Harald Kliems: Travel times on Willy Street, Part 2. Retrieved from https://haraldkliems.netlify.app/posts/travel-times-on-willy-street-part-2/

    BibTeX citation

    @misc{kliems2025travel,
      author = {Kliems, Harald},
      title = {Harald Kliems: Travel times on Willy Street, Part 2},
      url = {https://haraldkliems.netlify.app/posts/travel-times-on-willy-street-part-2/},
      year = {2025}
    }